Drawing of installation including three LPG tanks of 7,500 lt capacity each, LPG -hot water type- vaporizers and boiler house, LPG network with 6 supplies, pressure reduction group, detection system with sound and optical signal, and vaporizer and boiler water temperature control system with sound and optical alarm and tank cooling system. |
|
|
|
|
Drawing of installation including LPG tank of 40,000 lt capacity, LPG -feed back type- vaporizer and boiler house, LPG network with 6 supplies, pressure reduction group, detection system with electro-valve normally closed, by-pass and tank cooling system. |
|
|
|
|